Resources
Plan the whole system.
Material, colour, preparation, protection and handover belong together. Use these resources to prepare your questions and request—not to bypass a written project specification.
R-01 Resources
These are on-site planning guides, not manufacturer-issued certificates or substitutes for the current approved technical data sheets. Confirm the applicable documents and revisions with your project advice. Application-guide pages can be printed for the selected substrate.
01
Specify
Cemento 3D application guide
Twelve substrate pathways, preparation, mixing, application, hold points and curing.
MicroCem-FB application guide
Substrate-specific preparation and the fibre-reinforced material’s application controls.
Selection and cost guides
Compare wall finishes, lime ranges, ArchiMetal metals and microcement kit totals.
Project material estimator
Full-cycle consumption, pack rounding, toner, allowances and a requested component schedule.
Colour and tone library
Sixteen named colours in TA Light, TB Medium and TC Dark, with physical samples governing final selection.
02
Prepare and hand over
03

